Peter Mac’s Move Campaign
The Challenge
In June 2016, Peter Mac relocated its main campus from East Melbourne to the new, purpose-built Victorian Comprehensive Cancer Centre. With patients and the wider community relying on continuity of care, clear communication ahead of the move was critical — any confusion or gaps in messaging risked real, negative impact on the people Peter Mac serves.
My Role & Approach
As the sole in-house Graphic Designer, and working with a newly developed visual brand, I translated the Communications team’s strategy and copy into cohesive, on-brand assets across a wide range of channels—including events, printed collateral, and large-format building graphics.
This required close collaboration with the Brand Manager and Executive Director of Communications to ensure consistency, as well as coordination with external printers and sign writers to bring the work to life at scale.
Results
The campaign generated strong public interest and extensive coverage across major Australian news outlets — a key factor in patients and visitors transitioning smoothly to the new building.
Role: Graphic Designer
Year: 2026
Client: Peter MacCallum Cancer Centre
Campaign artwork was placed in key high-traffic areas of the old building — including the main lifts, entrance airlock, and entrance windows — to maximise visibility and raise awareness of Peter Mac’s impending move among patients and visitors.
Artwork on main lifts and a badge for designated staff to wear during the move period, to encourage patients and visitors to ask questions about the move.
Main entrance airlock pillar wrap artwork and a photo of the pillar in after artwork installation.
Window decal artwork above, and shown in situ along the walkway to the main entrance at the old building.
Flags at the Haymarket roundabout, just outside Peter Mac’s new home, announced the new location to passers-by. A simple design and message kept the flags legible at speed, with the new building visible in the background.
Print assets including posters, flyers and press ads — informed patients and the community of what they needed to know and how the move would affect them.
Artwork on main lifts and a badge for designated staff to wear during the move period, to encourage patients and visitors to ask questions about the move.
Window decal artwork above, and shown in situ along the walkway to the main entrance at the old building.
An A4 double-sided flyer served as a patient and visitor information asset, informing visitors abou the carparking at Peter Mac’s new home.
Four-page A4 brochure served as a patient and visitor information asset, raising awareness of Peter Mac’s new home.
New wayfinding and branding signage was rolled out across Peter Mac’s new main facility and satellite facilities following the move and closely coinciding rebrand.
New Peter Mac branding was installed through out the new Pater Mac main facility in Parkville, including the pictured above on a secondary entrance (left), and in the executive offices hallway (right).
New Peter Mac branding, information and wayfinding signage was installed at Peter Macs satellite facilities in Bendigo, Box Hill, Monash and Sunshine.
Temporary large format signage was installed at Peter Mac’s old main facility to inform patients and visitors that Pater Mac had moved, and the Eye and Ear Hospital was moving into the old building soon.